The bigger picture

Power cuts in CA6

Cumberland · 1 April 2026 to 31 March 2027

Area figures count periods without power across the district’s postcode sectors. They are not the number of cuts every household experienced, and they only cover cuts recorded since PowerLogs began.

Power cuts by month

2026/27

Unplanned power cuts only. Months still to come are left empty.

64power cuts recorded

Across CA6’s postcode sectors

27lasting 3 hours or more

The length that counts towards repeat-cut compensation

21h 31mlongest power cut

Approximate where the end time is a window

A closer look at each sector

Full postcodes stay off public pages
Postcode sectorPower cuts3 hours or moreLongest
CA6 41765h 50m
CA6 5291121h 31m
CA6 627142d 1h

One incident can cover several sectors, so sector figures do not add up to the district total. Sources and limits

See the record for your postcode

Area figures tell the story. Your postcode record adds the detail.

Check your postcode